Introduction
SBS has developed an excellent working relationship with the social housing provider Trent & Dove. During the demonstrator phase of the Social Housing Decarbonisation Fund, we delivered a £1m multi-measure scheme in Uttoxeter. This was followed by a £26m retrofit for the Matrix Housing Consortium, of which Trent & Dove is a member, funded via SHDF Wave 2.1.
This latest scheme, begun in January 2026, was another multi-measure scheme, this time directly awarded by the client and funded by Wave 3 of the Social Housing Fund. It focused on 240 occupied homes in Burton upon Trent. Featuring flats, bungalows and houses across a variety of archetypes, the dwellings required a mix of improvements. However, the overarching aim was to improve energy efficiency so all properties would achieve an EPC band rating of C or better. The works would help residents to save money and support the client’s progress towards net zero.
The Project
In accordance with the demands of the PAS standards, the retrofit measures were designed and planned following property-by-property surveys. These surveys helped to ensure that the resulting measures would be cost effective and appropriate.
Adhering to ‘fabric first’ principles, the project team agreed on a range of decarbonisation measures, including installing new or top-up loft insulation, fitting new energy efficient doors and windows, and enhancing the homes’ ventilation systems to help eliminate the risk of condensation and damp. In addition, the design called for the use of air source heat pumps, solar PV arrays and high-heat-retention storage heaters.
In order to deliver economies of scale to minimise overall disruption to residents, the clients also asked the team to undertake re-roofing works concurrently with the retrofit measures.
The works, scheduled to run until November of the same year, required some creative problem-solving. A key challenge was routing cabling through the blocks of flats, whilst maintaining the integrity of the existing fire compartmentation. The solar PV panels were mounted on the roofs, and feeds ran down to ground floor level. This required careful attention to fire protection as they passed through the various floors, ceilings and loft spaces. After studying the premises, our team noted that redundant bin chutes within the blocks offered an ideal centralised location for the inverters, and we duly submitted a proposal to the fire service and the client’s compliance team. The solution was agreed in full. This obviated the need to disturb any fire walls or access individual flats, helping to speed progress and significantly reducing disruption to residents.
As SBS regional director Steve Roberts noted: “The bin chute solution was just one example of what’s possible when the right people come together early and approach challenges with a practical mindset. It protected the integrity of the building’s fire safety design, it minimised disruption to tenants, and it delivered a cleaner, more efficient installation overall.”
Results
Through thoughtful design work and excellent resident communications, the work progressed quickly, effectively and on budget. The team completed the first 104 properties in just 11 weeks, reflecting the careful planning and collaboration that went into the project from the outset.
Beyond managing the energy efficiency improvements, we provided additional social value by donating to a community cycling group. The group had run for more than four years, giving local ladies the opportunity to improve their fitness, build their confidence and make new connections. Some of its members don’t speak English as their first language, so the group also helps them develop their communication skills and feel more connected within their community. In short, it helps to break down cultural barriers and reduce social isolation. As part of our support for the group, we provided a new bike, which will allow more ladies to get involved and take part in the sessions. Further social value initiatives, including providing staff uniforms and erecting garden sheds, are currently being planned with T&D.
Team Feedback
Speaking about the scheme’s overall impacts, SBS Site Manager Kerry Hancock said: “The communication and teamwork across the project have been key to achieving such great results. Everyone has played an important part, and it is a real pleasure working alongside so many people with so much commitment and dedication. A huge well done to everyone who has played a part … It’s a great achievement for everyone involved, and one we can all be proud of.”
Resident Feedback
“I’m really pleased with the work that has been done at my home. I’ve had solar panels and a new air source heat pump fitted, along with some other improvements including new kitchen and bathroom ventilation. The solar panels are great – now helping me use less electricity from the grid and reducing my bills; I have really seen a difference! It’s good to know I’m making use of renewable energy, and I am using my appliances more in the house as I know it’s now not costing me so much money as it used to.
“The new ASHP has also made a big difference. My home feels warmer, and the heating is much better than it was before. I have noticed the hot water is a lot hotter. It’s also nice knowing I have a newer, modern, efficient heating systems.
“The contractors have been really good throughout the work. They have been polite, friendly and respectful, and have explained things to me when I’ve had questions. They have worked hard and left everything tidy when they finished. I cannot fault them; they have been amazing. The scaffolding team really helped out. My husband is a wheelchair-user and they accommodated our needs by giving us extra room by moving the scaffolding poles to give us clearer access.”
Funding
Warm Homes: Social Housing Fund Wave 3
No. of Properties
240
PAS Roles
Principal Contractor / Retrofit EEM Installer
PAS Energy Efficiency Measures (EEM)
Air Source Heat Pumps / Loft Insulation / Replacement Windows and Doors / Re-Roofing / Solar PV / Storage Heaters / Ventilation
Framework
Directly procured